Chaska, MN · SW Twin Cities metro Open Mon-Fri 8a-5p Veteran-owned · Family-run · Since 1996 (612) 369-1631

Driveway Coating · Bloomington, MN · Est. 1996

Driveway Coating in Bloomington, Minnesota.

Bloomington is the largest city in our service area, just south of Minneapolis. It is home to the Mall of America and MSP International Airport, and to one of the metro's deepest stocks of 1950s and 1960s suburban housing. The city splits cleanly. West Bloomington runs executive-tier, East Bloomington more affordable, and the Minnesota River bluff defines the southern edge. Driveway coating for Bloomington homes. We match the system to how the driveway is used: penetrating sealer for protection-only, polyurea + polyaspartic for a finished surface, flexible urethane for older slabs with movement. East Bloomington is dense with 1950s and 1960s ramblers, split-levels, and Cape Cods; West Bloomington runs newer executive infill on larger wooded lots. Garage norms reflect the era split: 1-car and 2-car detached on the original 1950s stock, 2-car attached on 1970s+ builds, 3-car standard on West Bloomington luxury builds. Full basements are universal; walkouts appear on Minnesota River bluff lots in the southwest.

Driveway Coating in Bloomington

What an install looks like in Bloomington.

Clear View has a long history in Bloomington, and it goes well beyond residential work. David's past project list includes the Mall of America and the Metropolitan Airport Commission, covering MSP International Airport Terminals 1 and 2. On the residential side, Bloomington's split between West and East drives a real difference in project profile. West Bloomington runs premium tiers on larger executive garages; East Bloomington runs the full range, with a strong angle of 'preserve what is left' on 1950s slabs that have weathered 70+ winters. Both halves of the city share the I-494 / I-35W salt-drift problem, which makes a real polyurea coating a different category of investment than a quick epoxy job.

Driveway Coating specifically in Bloomington

Driveway coatings in Bloomington are most often booked when a homeowner is also coating the garage and wants the apron to match. Apex flexible tier for the slab move and the heavy salt-drift from the I-494 / I-35W commuter corridors. Bundle pricing when garage and driveway are scheduled in one mobilization.

Neighborhoods we work in

  • West Bloomington
  • East Bloomington
  • Hyland-Bush Lake
  • Penn-American
  • Oxboro
  • South Loop District
30+ YR Years working concrete Driveways included
Salt Resistant De-icer + brine tolerant
UV Stable Polyaspartic topcoat
A+ BBB rated Accredited since October 2005

Why sealing is the highest-ROI driveway service in Bloomington

Why driveway sealer is the difference between a 20-year driveway and a 30-year one.

Untreated Minnesota driveway concrete absorbs water, salt, and brine all winter. Each freeze-thaw cycle pulls the surface paste apart from inside (spalling), and the surface scales over time. A penetrating sealer is the cheapest intervention with the highest return: it stops the absorption, which stops the freeze-thaw damage. Reapplied every 5 to 7 years, it can add a decade of useful life to the slab.

Untreated driveway concrete What most driveways look like
  • Absorbs water, brine, de-icer
  • Surface scales and spalls over time
  • Faster aging from freeze-thaw
  • Full replacement at 20 to 25 years
Sealed every 5 to 7 years What we'd put on our own driveway
  • Penetrating sealer blocks moisture absorption
  • Slows freeze-thaw scaling significantly
  • Affordable: a few hundred to a few thousand per cycle
  • Adds 10+ years to slab life

A sealer is not glamorous, but a $1,500 sealer cycle every 6 years is a much better deal than a $12,000 replacement at year 20.

Bloomington Pricing

Driveway coating pricing in Bloomington, MN.

Driveway pricing tracks square footage closely. The choice of tier and current slab condition do the rest. Most driveways are a 1- to 2-day install with a few days of cure before drive-on traffic.

Single (1-car wide)

~400 to 600 sq ft

From $1,200 to $6,800
  • Most common single-vehicle drives
  • Essential or Ultimate tier
Get my number

Standard (2-car wide)

~700 to 1,000 sq ft

From $2,400 to $10,000
  • Typical suburban driveway with turnaround
  • Most common is Essential sealer or Ultimate film
Get my number

Large or oversize (3-car+ or extended)

1,200+ sq ft

From $4,500 to $14,400+
  • Long rural driveways, multi-car wide, or with parking areas
  • Apex tier or premium sealer choice
Get my number

Cracks, spalling, or oil-stained concrete add to prep time. We assess condition during the in-home estimate and write the quote to include any necessary repair work.

The 6-step install

How we install your floor in Bloomington.

Same prep on every driveway, scaled to the slab in front of us. The reason a 30-year coating shop stays busy is repeat customers from sealer cycles.

  1. 1

    In-home assessment + written quote

    Visit the property, measure the driveway, assess slab condition, write the fixed quote on the right tier.
  2. 2

    Surface clean + diamond-ground prep

    Pressure wash to remove embedded dirt and stains, then diamond grinding for film-tier installs. Sealer-only tier skips the grind but still requires a thorough surface clean.
  3. 3

    Crack + spall repair

    Hairline cracks filled. Spalled areas patched and feathered. Joints addressed before coating.
  4. 4

    Sealer or basecoat application

    Essential tier: sealer worked into the concrete in two passes. Film tiers: polyurea or flexible urethane basecoat rolled at full thickness.
  5. 5

    Decorative + topcoat (film tiers)

    Ultimate tier: decorative flake broadcast, scraped flat after cure, polyaspartic UV-stable topcoat seals everything in. Sealer tier skips this step.
  6. 6

    Walk-through + cure

    Final walk-through. Walk-on at 24 hours for film tiers, 48 to 72 for sealer. Drive-on at 48 to 72 depending on tier and weather.

Bloomington questions

Common questions for Bloomington homeowners.

Have you really worked on the Mall of America and MSP Airport?
Yes. David's past commercial project list includes the Mall of America, the Metropolitan Airport Commission (MSP International Airport, Terminals 1 and 2), and the City of Minneapolis, alongside thousands of residential garages, basements, patios, and stone surfaces. The same owner-operated standard governs every project, residential or commercial.
My East Bloomington garage is from 1958. Is the slab still worth coating?
Most are. A 70-year-old garage slab that has not been replaced has been showing surface damage for decades; the question is whether the structure underneath is sound. We assess at the in-home estimate: diamond-grind a small test area, check the bond integrity, look for active cracking versus cosmetic. Most East Bloomington slabs respond well to a full-prep polyurea install. The ones that do not, we say so honestly and recommend replacement before coating.
How long does a typical Bloomington project take from call to install?
Bloomington travel from Chaska is around 20 to 25 minutes off-peak. In-home estimate usually within a week of your call; install scheduling typically 3 to 6 weeks during peak season (May to September), 1 to 3 weeks off-peak. We schedule the install so you can have the garage back in service within the 24 to 48 hour cure window per tier.
Do you serve all of Bloomington or just one side?
All of Bloomington: West Bloomington, East Bloomington, the Hyland-Bush Lake area, Penn-American, the South Loop, and the Minnesota River bluff neighborhoods. The travel from Chaska is the same regardless of side.
Will this stop my driveway from cracking?
No coating prevents future cracking; the slab moves with the seasons and that movement causes cracking over time. The Apex tier (flexible urethane) bridges existing hairline cracks so they don't telegraph through. Sealer prevents the surface scaling that comes from absorbed moisture freezing, which is different.
How often do I re-seal?
Essential sealer: every 5 to 7 years for Minnesota driveways. Film coatings (Ultimate, Apex) last much longer; on a typical install, no maintenance re-coat for 10+ years.
What about snow plowing and shovels?
Plastic shovels and rubber-edged plow blades are fine on either sealer or film. Metal-edge plows or sharp scrapers will eventually mark the topcoat surface; same as they would on stamped concrete. Daily ice melt use is fine.
Can you do it over an asphalt driveway?
No. These systems are concrete-specific. Asphalt sealers are a separate category and we don't offer them.
What about hot tire pickup?
Polyurea handles hot tires without lifting; this is the most common epoxy failure mode but not a polyurea problem.
How long does the install take?
Most driveways are 1 to 2 days on site. Drive-on cure is 48 hours minimum for film tiers, longer for sealer in cool weather. We schedule with you so you can plan around vehicle access.
Will it look glossy?
Essential sealer is matte (looks like wet concrete that's now dry). Ultimate and Apex tiers have a satin to semi-gloss topcoat finish; the exact level is chosen at the estimate.
Can I coat just part of the driveway?
Yes, sealer can be re-applied in sections. Film coatings work best as a single-day full install; partial film coating creates a visible seam.
Do you offer a warranty?
Yes, written limited warranty on every install, with terms varying by tier. Walked through at the estimate.

More in Bloomington

All the services we offer in Bloomington, MN.

Driveway plus garage plus walkway is a common multi-surface visit. Bundle pricing when we can prep multiple slabs in the same install window.

Restoration in Bloomington

Other surfaces we work on in Bloomington.

Clear View runs both sides of the business out of the same shop. If you're booking a driveway coating in Bloomington, bundle pricing applies when we restore or coat another surface in the same visit.

Get a quote

Ready for a driveway coating install in Bloomington?

Tell us about your driveway. We'll get back with quote details for Bloomington within one business day.

  • Free on-site measurement
  • Written limited warranty
  • No subcontractors, no upsells
FREE QUOTE

Tell us about your driveway.

Text David (fastest) Call