Ultimate
Polyurea + polyaspartic with added aggregate. Standard pool deck spec.
- Slip-resistant aggregate in topcoat
- UV stable polyaspartic
- Chlorine + salt water tolerant
- 15-year written warranty
$3,400 to $10,000+ per project
Pool Deck Coating · Chaska + SW Twin Cities · Owner-operated since 1996
A pool deck has three jobs a normal patio doesn't: stay grippy when wet, tolerate chlorine and saltwater, and stay cool enough to walk on barefoot in July. We use UV-stable polyaspartic topcoats with added aggregate for grip, sized to the deck and the bather load. Walkable in 24 hours, swimmable in 48.
What we install
Pool decks need grip, color stability, and chemical tolerance that a normal patio coating doesn't. The systems we use here are spec'd for that environment, including the topcoat aggregate that gives bare feet traction on wet concrete.
Polyurea + polyaspartic with added aggregate. Standard pool deck spec.
$3,400 to $10,000+ per project
Flexible urethane. For older pool decks with cracking or settling.
$5,000 to $14,400+ per project
Why pool decks need their own coating spec
Three things: slip resistance, heat reflectivity, and chemical exposure. A pool deck coating without all three is a patio coating in the wrong context. Aggregate in the topcoat handles grip. Light color reflects heat for barefoot comfort. UV-stable, chlorine-tolerant chemistry handles the chemical side. We don't shortcut any of the three.
Transparent Pricing
Pool deck pricing tracks square footage and prep complexity. Concrete near pools sometimes has settling, efflorescence from chlorinated water, or surface damage from years of pool chemicals; all that gets addressed during prep.
Up to ~300 sq ft
~400 to 700 sq ft
800+ sq ft
Pool deck installs schedule around the pool-open season. We can install over the spring opening window or in fall after closing; both work better than mid-summer for cure conditions.
The 6-step install
Pool deck prep is more involved than a normal patio because of the water exposure history. Same checklist, scaled to the conditions.
Common Questions
Where we install
Pool deck coating across the SW Twin Cities metro. Schedule spring opening (April to May) or fall closing (September to October) for best cure conditions.
Get a quote
Pool deck installs are seasonal. Spring and fall are the best cure windows. Booking early in the season means the deck is ready when you want to use the pool, not after it.